Safety precautions:
The dangerous situation caused by incorrect operation will result in death, serious personal injury, or property damage.
Incorrect grounding can lead to dangerous situations such as death, serious personal injury, or property damage
Do not touch the transmission part of the running motor, as it may cause personal injury.
Do not operate directly in front of the mold as it may cause personal injury
Do not disassemble the mold with electricity, as it may cause personal injury
Wear high-temperature gloves when disassembling the mold to avoid unnecessary burns
When operating the filter, do not stand at the front end of the discharge port of the barrel to prevent splashing of the melt. May lead
Causing personal injury
Do not tamper with electrical equipment, and all electrical operations are prohibited for non electricians
In terms of operation:
Install the entire production line. The entire line is placed on a horizontal ground, which is made of 200mm cement
Flatten the ground without the need for foot screws and connect to the power supply. The power supply voltage is three-phase 380V 50HZ
Check if the power is normal and if the forward and reverse rotation are normal. 10 square meter power cord according to national standard
Power on heating, add the appropriate temperature to the material used. For example: PP/
PE: 185-220 degrees
The temperature has increased, and it is normal to start pouring water into the sink, controlling the size of the water, and then returning to normal. The sink is a 1-inch water pipe
Feed the material into the hopper, start the main engine, and after the main engine is running normally, open the discharge port.
The discharge of the host is normal, observe if the current is normal, then turn the host frequency to 10Hz and use a shear
Cut off the large piece of material that has just come out with a knife.
Then the host accelerates, and the rewinder accelerates simultaneously in proportion, and then cuts off the card like the mold
Heat the plastic strip on the mold and place it on the material coming out of the mold
Then it was separated.
After normal operation, add materials and collect them from behind the granulator.