Plastic Bellows Electric Making Machine Mould Double Wall HDPE

Product Details
Warranty: 1 Year
Product Type: PE Water-supply Pipes
Screw No.: Single-screw
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Experienced Team
The supplier has 9 foreign trading staff(s) and 8 staff(s) with over 6 years of overseas trading experience
ODM Services
The supplier provides ODM services
OEM Services
The supplier provides OEM services for popular brands
to see all verified strength labels (26)
  • Plastic Bellows Electric Making Machine Mould Double Wall HDPE
  • Plastic Bellows Electric Making Machine Mould Double Wall HDPE
  • Plastic Bellows Electric Making Machine Mould Double Wall HDPE
  • Plastic Bellows Electric Making Machine Mould Double Wall HDPE
  • Plastic Bellows Electric Making Machine Mould Double Wall HDPE
  • Plastic Bellows Electric Making Machine Mould Double Wall HDPE
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Certifications
  • Packaging & Shipping
  • Installation Instructions
  • Our Advantages
Overview

Basic Info.

Model NO.
PLCS
Automation
Automatic
Computerized
Computerized
Certification
CE, ISO9001:2008, QS, GMP
Customized
Customized
Condition
New
After-sales Service
1 Year
Color
Customizable
Screw Diameter
25mm
Cooling System
High-Efficiency Ultra-Quiet Blower
High-Precision Extrusion Head
1 Set
Transport Package
The Packaging of The Equipment Needs to Meet The E
Specification
20-foot container
Trademark
PLASTEX
Origin
Tongling
Production Capacity
300000

Packaging & Delivery

Package Size
3000.00cm * 1500.00cm * 1200.00cm
Package Gross Weight
200.000kg

Product Description

Product Description

 Bellows have thin walls and high sensitivity, ranging from tens of mpa to tens of megapascals.  The open end is fixed, the sealed end is in a free state, and an auxiliary coil spring or reed is used to increase elasticity.  When working, under the action of internal pressure, the tube extends along the length direction, so that the movable end produces a certain relationship with the pressure displacement.
   
  Bellows mainly include metal bellows, corrugated expansion joints, corrugated heat exchange tubes, diaphragm boxes and metal hoses. Metal bellows are mainly used to compensate thermal deformation of pipelines, absorb shock, absorb pipeline settlement deformation and other functions, widely used in petrochemical, instrument, aerospace, chemical, electric power, cement, metallurgy and other industries.

Detailed Photos

Plastic Bellows Electric Making Machine Mould Double Wall HDPEPlastic Bellows Electric Making Machine Mould Double Wall HDPEPlastic Bellows Electric Making Machine Mould Double Wall HDPEPlastic Bellows Electric Making Machine Mould Double Wall HDPEPlastic Bellows Electric Making Machine Mould Double Wall HDPEPlastic Bellows Electric Making Machine Mould Double Wall HDPEPlastic Bellows Electric Making Machine Mould Double Wall HDPE

Product Parameters
Precision Tension Pay-off Unit PL-PO
Heating Trough PL-HT
PL-25 Extruder PL-25
3M Stainless steel Cooling Trough PL-Cl-3M
Puller & Cutter Combination PL-PC
2.0 Conveyor PL-CV-2
Servo Control Single-station Winder PL-SW
Certifications

Plastic Bellows Electric Making Machine Mould Double Wall HDPE

Packaging & Shipping

Plastic Bellows Electric Making Machine Mould Double Wall HDPE

Installation Instructions
  1. To quickly heat up, replace the heating ring with gas to heat the mold core rod  It must be fully heated until the material comes out of the core rod customers need to heat the part 3minutes to let material out is ok.
  2. If the heating of the die core rod at the machine head is not sufficient, the material directly coming out of the screw will break the machine head.
  3. After the material come out from the mould die bushing , you should see the material direction.

     

 

Our Advantages

1, beautiful appearance, beautiful color, novel modeling, strong material, durable

2, low power consumption, low noise, energy saving and reduce production costs

3, the equipment is easy to operate, easy to get started, smooth operation, safe and reliable use

4, advanced equipment technology, reasonable structure, reliable performance, high efficiency, strong extrusion capacity

Our company provides reliable quality equipment, perfect service support, carry out the integrity of the purpose, customers can rest assured to buy.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now